{"id":"e-798bfa3a83d1e4b4","operation":{"operation":"obreschkoff_combination"},"operation_detail":null,"conclusion_id":"n-68458fe983bd99b5","premise_count":2,"theorem":"Hermite--Kakeya--Obreschkoff: real-rooted f, g with interlacing zeros give a zero or real-rooted a f + b g for all real a, b (Obreschkoff 1963; Fisk, Polynomials, roots, and interlacing, Thm 1.43)","lean_route":null,"lean_declarations":[],"certificate_hash":"f5a9e8c794a313105309dec21d6a16c65cb973371f26ca744596efffb5279c37","verification_polytool":"replayed","verification_lean":"not_attempted","certificate_kind":"obreschkoff_combination","certificate_raw_size":14341,"certificate_compressed_size":3238,"conclusion_name":"obreschkoff_combination of Triangle read by rows: T(n,k) is the number of Schroeder paths of length 2n and having k weak ascents (1<=k<=n). A Schroeder path of length 2n is a lattice path from (0,0) to (2n,0) consisting of U=(1,1), D=(1,-1) and H=(2,0) steps and never going below the x-axis. A weak ascent in a Schroeder path is a maximal sequence of consecutive U and H steps.","claims":[{"claim":"real_rooted","from_index":1,"region":{}}],"premises":[{"position":0,"node_id":"n-6a30765140629bd5","role":"sequence","name":"Triangle read by rows: T(n,k) is the number of Schroeder paths of length 2n and having k weak ascents (1<=k<=n). A Schroeder path of length 2n is a lattice path from (0,0) to (2n,0) consisting of U=(1,1), D=(1,-1) and H=(2,0) steps and never going below the x-axis. A weak ascent in a Schroeder path is a maximal sequence of consecutive U and H steps.","uses":{"claim":"real_rooted","from_index":1,"region":{}},"uses_text":"Every row P_n, n >= 1, is zero or real-rooted with all roots in (-inf, +inf)"},{"position":1,"node_id":"n-6a30765140629bd5","role":"sequence","name":"Triangle read by rows: T(n,k) is the number of Schroeder paths of length 2n and having k weak ascents (1<=k<=n). A Schroeder path of length 2n is a lattice path from (0,0) to (2n,0) consisting of U=(1,1), D=(1,-1) and H=(2,0) steps and never going below the x-axis. A weak ascent in a Schroeder path is a maximal sequence of consecutive U and H steps.","uses":{"claim":"interlacing","from_index":2,"kind":"weak","orientation":"unordered"},"uses_text":"Rows P_(m-1), P_m interlace (weak, unordered) for every m >= 2"}],"cited_by":[{"node_id":"n-68458fe983bd99b5","claim":"real_rooted"}]}
